Installing a roof solar shingle system is a modern way to generate clean energy while maintaining the aesthetic appeal of your home



Unlike traditional solar panels that sit on top of your roof



solar shingles are engineered to mimic the appearance of asphalt or slate shingles while producing power



A certified solar contractor will conduct a thorough roof evaluation



A certified installer will check the condition, angle, and orientation of your roof to determine if it’s suitable for solar shingles



The contractor analyzes your historical electricity consumption to design an appropriately scaled system



Once the assessment is complete and you’ve approved the design, permits are obtained from your local building department



This step ensures the installation meets safety and electrical codes



After permits are secured, the old Mundell Roofing Albion Park material is carefully removed down to the roof deck



This is important because solar shingles must be installed directly onto a solid, stable surface



Structural weaknesses are addressed with high-grade plywood or OSB to support decades of service



A premium synthetic or felt underlayment is rolled out across the entire surface



Without this layer, water infiltration could damage the roof structure and electrical components



Each shingle is laid in sequence from the lowest point, moving upward in overlapping rows



The shingles feature built-in conductive strips that link them in a continuous circuit



Specialized fastening hardware ensures both mechanical stability and weather resistance



Every shingle is leveled and spaced to ensure optimal sunlight exposure and visual continuity



The solar array is wired to a central inverter that transforms DC power into usable AC electricity



This critical component is often placed in the garage, utility room, or adjacent to your breaker box



From there, wiring runs to your home’s electrical system, often through a dedicated circuit breaker



A utility meter may also be installed or upgraded to track how much energy you produce and use, especially if you plan to participate in net metering



After the electrical connections are complete, the system undergoes a final inspection by a local building official



They check that everything is installed correctly and safely



Once approved, the system is turned on and tested



Most systems include smartphone apps or web portals to track daily output, savings, and carbon reduction



They’ll also explain maintenance requirements, which are minimal—usually just occasional cleaning and visual inspections



Installation duration varies from 2–7 days based on roof complexity and local weather



You receive a seamless, high-performance energy system that lowers bills, shrinks your ecological footprint, and elevates your home’s visual appeal