Jump to content

Critical Code Requirements For Business Construction Ec m: Revision history

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

17 December 2025

  • curprev 16:3516:35, 17 December 2025 172.18.0.1 talk 6,056 bytes +6,056 Created page with "A connection to earth (see Art. If you have multiple neutral-ground present paths, the resulting floor loops play havoc with sensitive digital tools. a hundred definition of "ground") does not do the job of bonding. The tools cases were grounded to the department circuit green wire whereas the network cabling shields had been grounded solely to a dedicated ground rod. Had the electrician bonded the community floor rod to the electrical service ground rod, the shock probl..."