Jump to content

Apartment Reworking Nyc Design-build Renovation Contractor: Revision history

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 January 2026

  • curprev 23:2523:25, 20 January 2026 172.18.0.1 talk 6,368 bytes +6,368 Created page with "The entire point of an Alt 1 in NYC is to change the Certificate of Occupancy or, [http://bt-13.com/index.php/About_H_n_Architects bt-13.com] if the constructing is pre-1938, to get your first C of O. If the work you plan would require getting a new or amended Certificate of Occupancy, then you have to file an Alt 1. The Certificates of Occupancy document lists the building’s authorized use or occupancy. Alternatively, [https://Tinygo.top/kp3o53 https://tinygo.top/Kp..."